Scaffold Sheeting Installation Guidelines

Professional scaffold design advice should always be sought prior to commencing work, and a full risk assessment of each project should be carried out.

For Weather Protection

If the prime purpose is to protect personnel against wind and rain, then upper sheets must overlap the lower sheets externally to ensure rain runs down the outside of the sheeting.

For Containment

If the prime purpose is to protect the surrounding area from the impact of demolition then the upper sheets must overlap lower sheets internally to contain debris within the sheeting.

Scaffolding Design

When Monarflex scaffold sheeting is to be installed, the structure must be designed to all relevant BS standards & codes of practice to accommodate the increase in wind loadings. Guidance should always be obtained by a qualified scaffold designer, or structural engineer before any sheeting is installed, and not before a full risk assessment has been carried out.

Only qualified Scaffolders should undertake the installation of Monarflex scaffold sheeting.

General Notes

 

1. Professional advice should always be sought prior to commencing work.
2. A full risk assessment of each project should always be carried out.
3. Sheeting should be Installed on the outside of scaffold framework.
4. Eyelets must face outwards.
5.Use only original branded Monarflex fixings.
6. A minimum of one fixing per metre in each direction should be achieved.
7. All scaffold ends should be sheeted.
8. Do not over-stretch fixing straps/ties.

Installation Advice

Recommended installation of Monarflex scaffold sheeting and the number of fixings required, when installing the sheeting. All Monarflex scaffold sheeting should be installed in accordance with the current British standard code of practice for nets and sheets BS 8093, and the subsequent revisions in BS 7955, which states that a minimum of one scaffold sheeting fixing should be used per metre, in each direction.

All of the Monarflex scaffold sheeting range are designed as temporary protection products, the sheeting should be installed on the outside of the scaffolding, with the eyelets on Super T-Plus or reinforced bands on Scaffband or Stripe facing outward, this will allow the sheeting to detach in high winds, as per its design, alleviating the build up of pressure on the structure. The eyelets and bands have been positioned on the sheeting with a view that sheeting is installed horizontally. However the performance of the sheeting will not be impaired if installed vertically provided the one fixing per metre in each direction is achieved.

Monarflex Super T-plus products installed in conjunction with the Anchor & Strap fixings have been wind tunnel tested, whereby the sheeting and fixings withstood hurricane force winds up to 77mph, at which point the eyelets / Anchor & Straps gave way, as per its design. It is worth noting that the wind speed in the tunnel was steadily increased, subsequent research by the BRE has established that gusting conditions of approximately 40 mph plus can cause structural damage, gusts in this region will be sufficient to break the fixings and remove the sheeting.

Monarflex Scaffband standard and FlameSafe installed in conjunction with the Monarflex blue flexitie is our economy scaffold sheeting and fixings, neither product has been wind tunnel tested, both are of a lower tensile strength to the Monarflex Super T-Plus & Anchor & Strap, however both meet the minimum standards as required by the current BS Standards. Although Monarflex Scaffband scaffold sheeting and the Flexitie meet all of the current requirements, it is worth pointing out that a lower wind speed than 40 mph will be sufficient to potential remove the sheeting from the structure.

All of the Monarflex scaffold sheeting range are temporary protection products designed to detach, with the exception of TRC and Kederflex..

Disclaimer

Due to our policy of continued research & development, Icopal Ltd reserves the right to alter any details as described. All products are available subject to our standard conditions of sale, which are available on request. The information contained within this website is of an illustrative nature. It does not form part of any contract or intended contract with the user. Final determination of the suitability of any information or material for the use contemplated and the manner of use is the sole responsibility of the user and the user must assume all risk and liability in connection therewith.

    Contact Icopal 0161 8654444

    Find Local Support

    To discuss your project in more detail please contact
    Your Local Area Manager

     

    Technical Support

    Telephone:

    0330 123 4585

    Email: technical.uk@bmigroup.com

     

    Sales Enquiries & Orders

    Telephone:

    0843 224 7400

    Fax:

    0843 224 7401

    Email: sales.admin@bmigroup.com

    Latest News

    Monarflex protects workers and pedestrians at Merseyside site

    Read more...

    Standard Industries Completes Acquisition of Braas Monier to Form Global Roofing Leader

    Read more...

    Icopal's Scaffold Sheeting Solution For Prestigious Central London Development

    Read more...

    Icopal Provides Bespoke Scaffold Wrap To Centre Point

    Read more...

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser

    Monarflex Scaffold Sheeting, Debris Netting and Temporary Roof Covering Range